
Remodel / Addition
15,000 s.f. / 200 Students
Completed Summer 2017
This Pre-K education project was an extensive remodel of a former bank that originally had drive through lanes located beneath the upper floor. The scope of work included a complete demolition of the interior of the upper floor as well as all paving at the ground level to accommodate a new foundation for an enclosed ground floor. Work performed while employed at th+a.



